Solutions · Data center construction
Specified grouts, waterstop, anchoring adhesives, joint sealants, firestop and slab-finishing products for data center sites and the on-site power that runs them, stocked in the brands the specs name and shipped to the jobsite on your date. Equipment grouting and waterstop are where we have done the most work. Let us help things go smoothly.
Working from a spec section or a submittal?
Send it for project pricing or call 888-809-2365.
Already know what you're looking for? Go straight to the category.
Foundations and below-grade concrete
Data center sites carry more water-holding and water-excluding concrete than most commercial work: thermal energy storage tanks, water treatment and recycling structures, cooling-tower basins, stormwater and fuel containment vaults, pits, sumps and deep foundation walls. Every construction and expansion joint in that concrete needs a waterstop matched to the joint, and every joint tied into existing concrete needs a retrofit system.
| Joint condition | What to confirm | Profile family |
|---|---|---|
| Expansion or isolation joint | Anticipated lateral, transverse and shear movement; head of water; profile width to embedment depth. | Ribbed centerbulb, dumbbell centerbulb, tear web |
| Construction joint with continuous reinforcement | Movement is negligible; confirm concrete cover on each side of the profile and splice method. | Flat ribbed, base seal, dumbbell |
| Slab-on-grade to wall (kicker or base) | Placement sequence and whether the profile is set in the first pour or bottom of the wall form. | Base seal, base seal with tear web, split flange |
| New concrete to existing concrete | Face condition, anchor spacing, batten and epoxy gel; movement expected at the interface. | PVC retrofit 655 / 609 series |
| Chemical exposure (fuel, treatment chemistry) | Check the material against the actual exposure; standard PVC is not rated for every fluid. | TPE-R, polyethylene or stainless, see TPERWaterstop.com |
Before you order: Sika Greenstreak PVC profiles meet CRD-C 572-74 and NSF/ANSI 61; splice with heat welding using the profile's own material. Fittings, splicing irons and hog rings are ordered with the roll footage, not after.
Data hall and electrical-room slabs
Data hall and gallery slabs carry rack loads, hard-wheeled lift traffic and, on many designs, the raised floor and containment above them. Specs call for densified, dust-free surfaces and filled control joints that support joint edges under wheel loads. Fill joints as late as the schedule allows so slab shrinkage is behind you.
Before you order: confirm joint width and depth, wheel loads on the joint, and how long the slab has been in place; polyurea and semi-rigid epoxy fillers behave differently when joints are filled early. Densifier and any later flooring or coating must be compatible; the spec usually names the system.
Tilt-up and precast envelope
Most data center shells go up as tilt-up or precast panels. Panel joints, expansion joints and roof-to-wall transitions are sealed with polyurethane or silicone systems sized to the joint movement, backed with rod, and patched where lifting and erection left damage.
Before you order: take joint width and count per panel from the erection drawings, not the elevations. Color matching across manufacturers is not guaranteed; order the full run from one product line and keep a color chart on the submittal.
Equipment yards, pads and on-site power
Every generator, transformer, switchgear lineup, chiller and UPS block sits on a baseplate that needs full bearing on its foundation. Campuses adding permanent on-site generation add gas turbines, turbine-generators and reciprocating engines to that list, each with its own OEM grouting requirement. Cement and epoxy machinery grout is the work Indcon does most, and the products below are stocked in the units the OEM sheets are written around.
| Equipment | What drives the choice | Usual direction |
|---|---|---|
| Gas turbines, turbine-generators, compressors | Dynamic load, vibration, thermal cycling and alignment retention. OEM installation manuals and API RP 686 Chapter 5 govern; expect creep (ASTM C1181) and compressive (ASTM C579) limits, plus foundation prep and grout conditioning requirements. | Epoxy machinery grout, deep-pour formulation where plate clearance and volume require it |
| Reciprocating engines and gensets on skids | Vibration and oil exposure. Enclosed gensets may sit on isolators or skid rails; confirm whether the base is grouted, shimmed or anchored only. | Epoxy where the OEM calls for it; cementitious precision grout for rails and pedestals |
| Transformers, switchgear, UPS, battery containers | Static load, bearing area and anchor bolt performance. Placement temperature and return-to-service time often matter more than chemistry. | Non-shrink cementitious grout to ASTM C1107; epoxy where chemical exposure or alignment is specified |
| Chillers, pumps, cooling equipment | Vibration, wet service and bolt patterns. Housekeeping pads are doweled to the slab with adhesive anchors before the equipment arrives. | Cementitious for pads and bases; epoxy under rotating equipment where specified |

Five Star DP High Flow is a three-component expansive epoxy machinery grout for large-volume bases where heat of reaction and bearing area matter: fills plate clearances as tight as 1/2 in, placements from 1/2 in to 18 in, approximately 95 percent effective bearing area when placed to Five Star guidance, and a published 55 °F to 95 °F ambient window. The Standard Flow 2.0 cu ft unit carries deeper pours with a 1 in minimum clearance.
Turbine pours are sized in units, conditioned to temperature and placed from a headbox across the shortest dimension. Tell us the plate dimensions, grout thickness and forecast placement temperature and we will size the order, including forming allowance and the pump if you need one.
Before you order: match the anchor to the evaluation report the structural drawings cite (ICC-ES ESR number, cracked concrete, seismic design category). Anchor ratings are per product, not per brand. Grout unit counts come from plate area, grout thickness and forming allowance; we will check your takeoff against the published yield.
Penetrations and rated assemblies
Data halls, electrical rooms and generator galleries are separated by rated walls and floors that cable tray, busduct, conduit and piping pass through by the hundreds. Each penetration needs a listed system matched to the assembly and the penetrant, and head-of-wall joints need a listed joint system.
Before you order: the listed system (UL or Intertek number) is chosen from the assembly and the penetrant; the product follows from the system. Count penetrations by type from the coordination drawings and order pillows and collars by opening size.
Steel, supports and turnover
Smaller scopes that show up at the end of a data center build and keep showing up after turnover.
Field touch-up on galvanized strut, tray supports and structural steel after welding and cutting. ZRC and Steel-It systems.
Coatings and corrosion protectionSika CarboDur carbon fiber for slabs and beams when equipment loads change after the structure is built.
Sika CarboDurSpall and edge repair on pads, curbs and panels before turnover inspection.
Concrete repairAir Sentry and Trico breathers for generator, transformer and hydraulic reservoirs once the plant is in service.
Desiccant breathersSpec crosswalk
Estimators work from the spec book. These are the MasterFormat sections where data center specs name the products on this page, and where each one lives on our site.
| Section | What it covers on a data center | Brands we stock | Shop |
|---|---|---|---|
| 03 15 13 Waterstops | Construction and expansion joints in tanks, vaults, basins, pits and foundation walls | Sika Greenstreak, Adeka | Waterstop |
| 03 62 00 Non-Shrink Grouting | Transformer, switchgear, UPS and equipment bases; column and bearing plates | Sika, Five Star, Euclid, Dayton Superior | Cement grout |
| 03 63 00 Epoxy Grouting | Turbines, generators, compressors and precision machinery baseplates | Five Star, Euclid, Sika, Adhesives Technology, Dayton Superior, Stratarock | Epoxy grout |
| 05 05 19 / 03 16 00 Post-Installed Concrete Anchors | Equipment anchorage, housekeeping pad dowels, seismic bracing, strut and tray supports | Simpson Strong-Tie, Adhesives Technology | Anchoring adhesives and fasteners |
| 03 35 00 / 03 39 00 Concrete Finishing and Curing | Data hall and gallery slab densifiers, hardeners and curing compounds | Euclid, Sika | Concrete finishing |
| 07 92 00 Joint Sealants | Tilt-up and precast panel joints, expansion joints, slab control joints | Sika, Master Builders, Tremco, Metzger McGuire, ChemLink | Caulks and sealants |
| 07 84 13 Penetration Firestopping | Cable tray, conduit, busduct and pipe penetrations in rated walls and floors | STI SpecSeal | Firestop |
| 03 01 30 Maintenance of Cast-in-Place Concrete | Spall, crack and edge repair on slabs, pads and panels | Sika, Euclid, Five Star, Metzger McGuire | Concrete repair |
Project orders
Send the specified products and quantities for the building, phase or equipment yard you are pricing. If the grout or waterstop is still under review, include the spec section and the equipment or joint details and we will help select it.
Indcon runs dedicated sites for the product families where selection is the hard part. Each carries the full line, guides and selection help for that material.

Thin, standard and deep-pour epoxy machinery grout from Five Star, Sika, Euclid, Stratarock and Adhesives Technology, with mixing and placement guides.
Visit Epoxy-Grout.com
Standard, high and ultra-high-strength non-shrink cementitious grout for baseplates, bearing plates and equipment foundations.
Visit CementGrout.com
Every Sika Greenstreak PVC profile by joint type, retrofit systems, and the complete guide to selection, splicing and installation.
Visit PVCWaterstop.comChemical-resistant waterstop (TPE-R, polyethylene, stainless) is covered at TPERWaterstop.com; new-to-existing joint systems at RetrofitWaterstop.com.
Follow the OEM installation manual first. Turbines, turbine-generators and compressors are almost always specified for epoxy machinery grout because of dynamic load, alignment retention and creep limits, typically referencing API RP 686. Transformers, switchgear and static equipment are commonly grouted with non-shrink cementitious grout to ASTM C1107. Send us the OEM sheet and spec section and we will confirm the product.
Plate length times width times grout thickness gives the neat volume; add forming and headbox allowance, then divide by the published yield of the exact unit and round up. Deep pours may need a specific formulation or lift limits. We size orders from your plate dimensions and thickness.
Every grout has a published placement window for material, foundation and ambient temperature. Epoxy grouts typically require conditioning the units and the foundation for a day or more before placement. Tell us the forecast and we will flag products and conditioning steps that fit it.
Choose by joint: ribbed centerbulb or tear-web profiles for expansion and isolation joints, flat ribbed or base seal for construction joints with continuous reinforcement, and a PVC retrofit system where new concrete meets existing. Confirm the head of water, the chemistry the joint sees and the NSF/ANSI 61 requirement if potable.
Use a retrofit waterstop system anchored to the prepared existing face with stainless batten bars, anchors and structural epoxy gel, then embed the new profile in the fresh pour. The 655 and 609 series are stocked with hardware.
Anchor ratings are product-specific. Each Simpson Strong-Tie and Adhesives Technology anchor product page links its ICC-ES report; match the report number and conditions (cracked concrete, seismic design category) to the structural drawings before ordering.
The listed system is selected from the wall or floor assembly, its rating and the penetrant; the product follows from that system. STI's system directory identifies the sealant, pillows or collars for each condition, and we stock the SpecSeal line to fill it.
Yes. Grout ships by the pallet and waterstop by the roll on common-carrier freight to a laydown yard or gate with a required-on-site date. Give us the delivery ZIP, receiving hours and any site access requirements with the order.
Please complete your information below to login.