Euclid Verticoat Supreme is a one-component, microsilica and latex modified, non-sag repair mortar for trowel-applied vertical and overhead work. Integral corrosion inhibitor. About 30 minutes working time. Place in 1/4 to 2 inch lifts.
Euclid Verticoat Supreme is a single-component, microsilica and latex modified, non-sag concrete repair mortar for trowel-applied vertical and overhead structural work. It is used on marine structures, tunnels, dams, parking structures, bridges, and parapet walls, above and below grade. The mortar has freeze-thaw resistance, high bond strength, and Canadian Food Inspection Agency and MTO listings.
| Property | Value |
|---|---|
| 1-day compressive | 2,000 psi |
| 7-day compressive | 3,500 psi |
| 28-day compressive | 5,500 psi |
| 28-day flexural | 1,000 psi |
| Freeze/thaw, 300 cycles | 90% RDF |
| Length change, 28 days | -0.10% |
| Working time | about 30 minutes |
| Initial set | 1 hour |
| Application thickness | 1/4 to 2 in per lift |
| Yield | 0.48 ft³ per 50 lb |
Verticoat Supreme Technical Data Sheet
What marine and tunnel work is Euclid Verticoat Supreme used for?
Euclid Verticoat Supreme is used on vertical and overhead repairs on marine structures, tunnels, and dams. It is also used on parking structures, bridges, and parapet walls, above and below grade.
What 28-day cube strength does Euclid Verticoat Supreme reach?
Typical laboratory value is 5,500 psi at 28 days on 2 inch cubes (ASTM C109M). 7-day compressive strength is 3,500 psi; 1-day is 2,000 psi. Expect reasonable variation under field conditions.
Which agency listings cover Euclid Verticoat Supreme?
It is listed to the Canadian Food Inspection Agency and MTO. Those listings are on the current Verticoat Supreme data sheet.
What set times does Euclid Verticoat Supreme have?
Approximate initial set is 1 hour. Approximate final set is 3 hours (ASTM C266). Typical laboratory values. Expect reasonable variation under field conditions.
What 28-day flexural strength does Euclid Verticoat Supreme reach?
Typical laboratory value is 1,000 psi at 28 days (ASTM C348). 7-day flexural strength is 900 psi. Expect reasonable variation under field conditions.
What lift range does Euclid Verticoat Supreme cover?
Placement is 1/4 to 2 inches per lift. Minimum application thickness is 1/4 inch.
Please complete your information below to login.