W. R. Meadows 1100 is a resin-based water-emulsion curing compound in a 5 gallon pail for interior and exterior concrete. The film holds mix water for hydration, then breaks down in about four weeks in sun and traffic.
W. R. Meadows 1100 is a resin-based, water-emulsion curing compound for interior and exterior concrete. It is used on horizontal and vertical surfaces. The film holds mix water so the cement hydrates, then begins to break down after about four weeks in UV. This 5 gallon pail is furnished ready to spray. Typical coverage is about 200 sq ft per gallon.
| Property | Value |
|---|---|
| Chemistry | Resin-based water emulsion |
| Coverage | Approximately 200 sq ft/gal |
| ASTM C309 | Type 1, Classes A and B |
| AASHTO M 148 | Type 1, Classes A and B |
| VOC AZ, CA | 42 g/L |
| VOC IL, GA, PA, TX | 278 g/L |
| Drying time | Typically 1 to 2 hours |
| Foot traffic | At least 4 hours |
| Application temperature | 40 F minimum |
| Film breakdown | About 4 weeks in UV |
Product documents: W. R. Meadows 1100 Data Sheet (PDF)
What concrete is W. R. Meadows 1100 Clear used on?
Interior and exterior concrete, on horizontal and vertical surfaces. The film is specified when a dissipating resin cure is wanted before later coatings.
What happens to the film after W. R. Meadows 1100 Clear has cured the slab?
After about four weeks the membrane begins to break down in UV. Traffic and weather speed that process until the film dissipates from the surface.
What pail size is W. R. Meadows 1100 Clear?
This listing is the 5 gallon pail. A 55 gallon drum and a 275 gallon tote are also packaged.
What coverage does W. R. Meadows 1100 Clear typically give?
Approximately 200 sq ft per gallon. Coverage may vary with finish, concrete condition, and weather.
What drying time does W. R. Meadows 1100 Clear need?
The film typically dries in one to two hours, depending on temperature, humidity, and wind. Foot traffic stays off the surface for at least four hours.
What flooring wait applies after W. R. Meadows 1100 Clear?
Paint, tile, or resilient flooring goes on after the film has dissipated and has been properly removed. A small test is recommended with the flooring manufacturer first.