Parcel Orders over $300 Ship Free.
Metzger McGuire Edge-Pro 80 Gauntlet Gray 10 Gallon Unit MMEP80-PT

Metzger McGuire Edge-Pro 80 Gauntlet Gray 10 Gallon Unit MMEP80-PT

Metzger McGuire Edge-Pro 80 Standard Gray 10 Gallon Unit MMEP80-PT

Metzger McGuire Edge-Pro 80 Standard Gray 10 Gallon Unit MMEP80-PT

Metzger McGuire Edge-Pro 80 High Tea 10 Gallon Unit MMEP80-PT

Metzger McGuire Edge-Pro 80 High Tea is a two-part 100% solids rapid-setting polyurea joint filler in a 10 gal kit for ground and polished retail joints. The filler is shaved flush so cart traffic can return on that slab.

  • Tack-free in 3 minutes
  • Wet grind at 30 minutes
  • Dry grind at 3-4 hours
$605.00
Drop Shipped

Metzger McGuire Edge-Pro 80 - High Tea 10 Gallon Unit MMEP80-PT

Metzger McGuire Edge-Pro 80 is a two-part 100% solids rapid-setting polyurea joint filler in High Tea. It is used on ground and polished exposed concrete retail floors so High Tea joints can be shaved flush and still protect edges under cart traffic. It is placed as a 10 gal kit of two 5 gal pails. Tack-free time is 3 minutes at 70 F, wet grind starts at 30 minutes, and dry grind waits 3 to 4 hours.

Key Features

  • This High Tea filler is used on ground and polished retail joints.
  • Tack-free time is 3 minutes at 70 F.
  • Wet grind can start 30 minutes after placement.
  • Dry grind waits 3 to 4 hours.
  • The slab is at least 28 days old before this filler is placed.
  • LEED v4.1 credit is on this High Tea kit.

Applications

  • Ground or polished exposed concrete retail floors are filled with this polyurea.
  • Construction joints are shaved flush with the slab.
  • High Tea is the color on those polished retail slabs.
  • Placement waits until the slab is at least 28 days old.

Technical Specifications

Property Value
Hardness, Shore A @ 70 F 80-81 (D-2240)
Tensile Strength 505 psi (D-638)
Tensile Elongation 152% (D-638)
Gel Time @ 70 F 35 seconds
Tack Free @ 70 F 3 minutes
Traffic Ready @ 70 F 1 hour
Mix Ratio (by vol.) 1:1
Operating Temperature -20 F to +120 F interior
Shave Window 15 min to 24 hrs
Packaging 10 gallon (US) kits (2-5 gallon US pails), High Tea

Product documents: Edge-Pro 80 Technical Data Sheet EP-1 REVISED 9/25 (PDF) | Edge-Pro 80 Safety Data Sheet 10/2024 (PDF)

Frequently Asked Questions

What cart-traffic work is Metzger McGuire Edge-Pro 80 used on?
This High Tea polyurea fills ground and polished retail joints so those edges hold under cart traffic after a flush shave.

What size is Metzger McGuire Edge-Pro 80?
The High Tea kit is a 10 gal kit (two 5 gal pails).

What tack-free time is on Metzger McGuire Edge-Pro 80?
This High Tea kit is tack-free in 3 minutes at 70 F.

What wet-grind window is on Metzger McGuire Edge-Pro 80?
High Tea can take a wet grind 30 minutes after placement at 70 F.

What ACI wait is on Metzger McGuire Edge-Pro 80?
This High Tea kit waits until the slab is at least 28 days old, and ACI often waits 60 to 90 days.

What VOC listing is on Metzger McGuire Edge-Pro 80?
There are no VOCs on this High Tea kit, and LEED v4.1 credit is on the sheet.